Showing posts with label conduit. Show all posts
Showing posts with label conduit. Show all posts

Monday, April 11, 2011

Sprinklers and Electric

Here is a shot of what I found recently on a job I am doing where someone in the past had taken and secured their wires and conduits to the sprinkler system and bottom of the HVAC equipment. What a nightmare we had repairing and re-routing all the wire and conduit.


Sunday, May 24, 2009

Energy Management

This is from a job another Electrician in our company is doing, This is a Energy management system. It basically controls the distribution of the electricity in an economical way, It can be connected to a main system through the Internet or phone lines. What it will do is manage what lights and or any other devices are on at any given time which in turn cuts electrical usage. These systems can become very complex with the use of occupancy sensors and such that would determine if there are people present in a certain area then turning the appropriate lights on or off.
Here are all the feeders heading to separate areas of the building.

Friday, December 19, 2008

New Jobsite Finally

The last few days me and my apprentice have been working at our other job site. It is nice to be in new surroundings that is one of the things I really enjoy about being an electrician, all the different job locations. The only thing bad about that is the driving, I do have a company truck I bring home but just the drive to the job sites can be long some days. This job is about an hour drive one way for me and thats not real bad. Last year around Thanksgiving I did a job about 5 1/2 hours from home so we stayed in a motel all week, I had a great time and got to meet a lot of people, my wife on the other hand did not much care for me being gone all week.

Today we worked on setting the back
box for our panel and getting our conduit into the back box. As for me I am on vacation for a week so I don't have to think about work for a while.

Thursday, November 13, 2008

Building The Service


The back box to our panel finally came the other day and today we finally set it in place. Now comes the fun part of pulling 250 XHHW from here to the house X3. Once we get the wire pulled and I can get everything terminated we will be one step closer to getting some permanent power turned on. This job has been a lot of fun because nothing on it has been normal.

Wednesday, November 5, 2008

New Jobsite


Today we got to start a new job because we are still waiting for part of the service at the old farmhouse. This a pair of restrooms at a stadium. nothing fancy just a service some heaters, lights and couple of plugs. I would much rather do commercial work over residential work, so I was happy today.














We also noticed there a whole bunch of new houses going in behind here.

Tuesday, October 21, 2008

Electrical Panel Layout

This is something new we ran across at work by RnD Products . It is meant to layout your panel when you need to make multiple knockouts for conduit. this is a great idea compared to the old way I have always done it, such as search the job site for a piece of cardboard. They also have some other great things on the website too. By the way our company did buy one too.

The PANEL BOARD Layout Tool



Tuesday, October 14, 2008

Setting A Quazite Box


Today we finally got around to finishing up a run of conduit that's going to feed a pool house.This is a Quazite box we installed at the end of our run. In the spring when they put the building in for the pool we can just run our conduits here instead of digging everything up again.

One thing I saw today that was nice for a change, was on my way home I noticed gas had dropped below $3.00 a gallon. I know things are looking kind of bleak but that did make me happy, maybe some other things will drop in price too.

Friday, October 10, 2008

Thank God It's Friday


Today we got the conduit runs finished and shot jet line through the pipe, they started back filling too.Its going to take a lot of stone dust to cover these pipes. They have already brought in 5 dump truck loads of it and they used most of it on 1/3 of the trench.










The only thing we have left is to get the low voltage conduits into the house on Monday since we ran out of pipe.

Thursday, October 9, 2008

Rocks and More Rocks


Today we almost finished the conduit run for the new feeds to the house. we could have been done long ago if it wasn't for all these rocks in the way everyplace. The excavator broke through this wall for us but the wall sits on a huge rock as you can see they broke that up with a track hoe with a jackhammer attachment.







Two of the conduits break off here to go to the new 60x45 building that is home to the indoor pool. In the morning we have to set a quazite box for them. then we can continue the other three into the house. This job is really starting to get exciting now everything is starting to come together on it and we can see some progress we have made.

Tuesday, October 7, 2008

Running Conduit for the Service

Today we worked on running the conduit's for the service, tomorrow we have to put stone dust on the pipe and get it ready to back fill.











This was a whole lot of work and the hard part is yet to come. We have a stone wall they dug under and we have to pass beneath before we get to the house. I am still waiting on my MDP and CT cabinet so i can mount all the hardware. So this project may slow down for me for a while. Knowing my luck everything will come in and the weather will turn so we end up doing all of it in nasty weather.